A Project of Motorway View City (Pvt) Ltd.
Home Location Contact
 
::.Welcome To Airport Gardens Housing Scheme.::
Key Features

Motorway View City (Pvt) Ltd. has purchased the desired area for the development of housing project. The main objective of the company is to provide residential plots to the people of Fateh Jhang and Islamabad area at affordable price with all urban amenities. The project is being controlled and developed by the Motorway View City (Pvt) Ltd. Technical supervision is being rendered by the qualified and experienced consultants. M/s “Designdesk” (Pvt) Ltd has specifically provided professional services for the preparation of layout design of the proposed housing project.

SITE CHARACTERISTICS:

The proposed project site area is combination of flat and undulating sloping land surface. General trend of slope of land surface is from North to South with some depression area in the central area of the project site. Survey Map of project site area with 2-ft contour interval and drawn to the scale of 1:1000 is attached.

The prominent attraction of the project site is its location on the Motor way passing on the North face of the project site.  

After detailed consideration of site constraints, ground topography, user requirements and Government of Punjab land use standards for Private Housing Projects, a functional layout design proposal has been evolved.

SCHOOLS:

One primary Schools at center level has been provided keeping in view the population of the proposed project area and surrounding area population. Placement of School is in accordance with the accessibility standards as prescribed in National Reference Manual.

PARKS AND PLAY FIELDS:

Total three parks are planned in the layout plan. One central park of 16.75 kanal is provided. Total area covered under Parks/Green area is 27.65 kanals. These Parks and green areas will help to promote healthy living environment.

MOSQUE: 

One mosque at the centre of housing project has been planned. Mosque is located within five minutes walking distance from all corners of the project area. 

HEALTH CENTRE: 

A site has been earmarked for the Health Centre in the center of housing project to provide medical facilities to the residents of scheme. 

GRAVEYARD: 

A plot of 6.85 kanals, reserved for Graveyard, and it will suffice for next forty years’ mortality.

OVERHEAD AND UNDERGROUND WATER TANK:

Water Tank area will be reserved at the corner of the park area keeping in view the higher ground levels. 

DESIGN PARAMETERS FOR AIRPORT GARDENS HOUSING PROJECT:

Gridiron pattern has been adopted for the layout of residential plots. The central facilities area consists of Park, Commercial, Jamia Mosque, and Health Centre at the junction of 60 ft wide major roads. 

Land topography has been duly followed. Emphasis has been laid upon well-defined road network for easy access and comfortable living environment. Parks and open spaces have been provided throughout the scheme. These areas have been adjusted at such locations, which are within easy access from all sides. For easy access, commercial areas have been planned along the major roads of the scheme

COMMUNITY FACILITIES AREAS: 

Total area of Airport Gardens housing project has been provided with desired community facilities areas. Community facilities area consists of the following land uses:-

 

            LAND USE                                       NUMBER

 

            Park and Play Fields                        3 (three)

            Commercial Areas                           2 (two)

            Primary Schools                              1 (one)

            College                                           1 (one)

            Mosque                                           2 (one)

            Health Centre                                   1 (one)

            Community Club                               1 (one)

WATER AVAILABILITY: 

The water supply for the residents of the proposed housing project will be arranged through underground tube wells. The Motorway View City (Pvt) Ltd. will be responsible to provide the sufficient quantity of water as per the laid down standards. Water resitivity survey report is attached along with other plans.

COMPLETION TIME: 

After the approval of layout Plan and completion of Engineering Design for Infrastructure Design,  completion time for development of Roads, Laying of water supply lines, storm water drainage, Electric and Sui gas network development will be completed within two and half year to three years time period.

::.Site Pictures.::

 
 

 

bullet Home
bullet Vision
bullet Nature
bullet Housing
bullet Commercial
bullet Conditions
bullet

Location

bullet

Key Features

bullet

Media Gallery

bullet

Booking Form

bullet

Price List

bullet Contact

::MVC Group::

::News::

 
Location of Airport Gardens Housing Scheme

 
Home  |  Terms & Conditions Contact